Resources and Reserves

Haile Gold Mine Estimated Resource 1 

Resource Classification Date Metric
Tonnes
(000's)
Gold
g/t
Short Tons
(000's)
Gold
oz/t
Cont oz
(000's)
Measured
1‐Sep‐08
2‐Feb‐09
26‐Mar‐09
14‐Oct‐09
12,264   1.708 13,518 0.050 673
12,588 1.737 13,876 0.051 703
13,786 1.782 15,196 0.052 790
24,258 1.885 26,739 0.055 1,470
 
Indicated
1‐Sep‐08
2‐Feb‐09
26‐Mar‐09
14‐Oct‐09
22,698 1.136 25,020 0.033 829
26,158 1.216 28,835 0.035 1,022
13,999 1.837 15,431 0.054 827
20,374 1.064 22,458 0.031 697
 
Measured + Indicated
1‐Sep‐08
2‐Feb‐09
26‐Mar‐09
14‐Oct‐09
34,961 1.336 38,538 0.039 1,502
38,746 1.385 42,710 0.040 1,725
27,785 1.810 30,627 0.053 1,617
44,632 1.510 49,198 0.044 2,167
 
Inferred
1‐Sep‐08
2‐Feb‐09
26‐Mar‐09
14‐Oct‐09
26,148 0.807 28,823 0.024 679
27,547 0.858 30,365 0.025 760
57,452 0.889 63,329 0.026 1,643
61,179 1.002 67,437 0.029 1,971

1 The resource calculations were completed by Gustavson Associates, LLC of Boulder, Colorado under the direction of Mr. Donald E. Hulse, PE, an independent Qualified Person pursuant to NI 43-101. The National Instrument 43-101 Technical Report was filed on SEDAR on December 3, 2009. On April 6, 2010, the Company filed on SEDAR an amended December 3, 2009 NI 43-101 Technical Report on the Resource Estimate (revised April 1, 2010) with the only significant change being the inclusion of the March 17, 2009 feasibility study. Please refer to the disclosures statements and forward looking statements.

 

Mineable Reserves by Cutoff 1

Haile Project
Lancaster County SC.
Estimated Minable Reserve
Proven Reserve Tonnes
(000s)
Gold Grade
(g/t)
Contained Gold
(000 oz)
0.015 oz/t (0.514g/t) 8,331 2.28 610
0.020 oz/t (0.686 g/t) 7,282 2.52 590
Probable Reserve      
0.015 oz/t (0.514 g/t) 12,290 1.84 729
0.020 oz/t (0.686 g/t) 10,529 2.05 695
          Proven and Probable Reserve    
0.015 oz/t (0.514 g/t) 20,621 2.02 1,338
0.020 oz/t (0.686 g/t) 17,811 2.24 1,285
Inferred Resource within Designed Pit    
0.015 oz/t (0.514 g/t) 4,883 1.36 214
0.020 oz/t (0.686 g/t) 3,912 1.55 195

1 A Feasibility Study was completed in February 2009 by a group of independent experts that included Roberts and Schaefer for process plant design, Vector Engineering for site civil and geotechnical work. Water Management for hydrology, Gustavson Associated for mine design, RDi and Phillips Enterprises for metallurgical development and Haynsworth Sinker & Boyd LLC for South Carolina tax and local regulatory statutes. Results of that Feasibility Study are included in the SEDAR filed NI 43-1010 Technical Report on Haile Gold Mine Project dated March 17th, 2009